Construction Rates

 

    

  

     Helping you  to build specifications, prices and get cost certainty back from the supply chain fast

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

   UK Sub Contractor Rates of Pay for 2012 - UK Construction Industry

  Bookmark and Share

See sub-contractor rates of pay for 2011 http://www.constructionrates.co.uk/Rate_Gen/Sub_contractor_rates_of_pay_2011_uk@constructionrates.co.uk.html

See sub-contractor rates of pay for 2012 http://www.constructionrates.co.uk/Rate_Gen/Sub_contractor_rates_of_pay_2012_uk@constructionrates.co.uk.html

See sub-contractor rates of pay for 2013 http://www.constructionrates.co.uk/Rate_Gen/Sub_contractor_rates_of_pay_2013_uk@constructionrates.co.uk.html

See sub-contractor rates of pay for 2014 http://www.constructionrates.co.uk/Rate_Gen/Sub_contractor_rates_of_pay_2014_uk@constructionrates.co.uk.html

See sub-contractor rates of pay for 2015 http://www.constructionrates.co.uk/Rate_Gen/Sub_contractor_rates_of_pay_2015_uk@constructionrates.co.uk.html

See sub-contractor rates of pay for 2016 http://www.constructionrates.co.uk/Rate_Gen/Sub_contractor_rates_of_pay_2016_uk@constructionrates.co.uk.html

 

The rates below are those directly paid to individual sub-contractors and should not be confused with daywork rates.

North East Last Past 3 month /Hour
  Month 3 months change Ave
Bricklaying 406.95 531.10 -23.38%        11.73
Civil Engineering 630.02 589.10 6.95%        15.24
Demolition 437.63 508.25 -13.89%        11.82
Electrical 739.09 604.85 22.19%        16.80
Equipment & Operator hire 596.51 629.00 -5.17%        15.32
Fit out by specialist trades 501.08 464.44 7.89%        12.07
General Construction 536.05 540.92 -0.90%        13.46
Insulation 504.12 568.19 -11.28%        13.40
Joinery 471.28 551.26 -14.51%        12.78
Mechanical 486.28 538.20 -9.65%        12.81
Plastering 480.47 653.98 -26.53%        14.18
Plumbing 506.41 446.51 13.42%        11.91
Roofing 532.13 426.54 24.76%        11.98
Scaffolding 458.48 485.55 -5.58%        11.80
Shopfitting 812.77 640.00 27.00%        18.16
Steel & Timber frame erect 561.59 590.65 -4.92%        14.40
Surfacing contractors 632.14 654.36 -3.40%        16.08
AVE….. 546.65 554.29 -1.38%        13.76
       
North West Last Past 3 month /Hour
  Month 3 months change Ave
Bricklaying 386.22 472.06 -18.18%        10.73
Civil Engineering 439.97 495.40 -11.19%        11.69
Demolition 398.69 378.25 5.40%         9.71
Electrical 691.13 702.52 -1.62%        17.42
Equipment & Operator hire 483.60 613.94 -21.23%        13.72
Fit out by specialist trades 569.94 492.50 15.72%        13.28
General Construction 739.69 697.59 6.04%        17.97
Insulation 680.28 792.24 -14.13%        18.41
Joinery 504.17 687.50 -26.67%        14.90
Mechanical 579.00 472.09 22.65%        13.14
Plastering 544.00 601.88 -9.62%        14.32
Plumbing 530.73 522.45 1.58%        13.16
Roofing 783.54 684.70 14.44%        18.35
Scaffolding 595.54 569.52 4.57%        14.56
Shopfitting 928.88 814.99 13.97%        21.80
Steel & Timber frame erect 498.27 473.58 5.21%        12.15
Surfacing contractors 486.32 577.36 -15.77%        13.30
AVE….. 578.82 591.09 -2.08%        14.62
         
Midlands Last Past 3 month /Hour
  Month 3 months change Ave
Bricklaying 427.75 435.40 -1.76%        10.79
Civil Engineering 770.59 710.24 8.50%        18.51
Demolition 448.27 350.47 27.91%         9.98
Electrical 771.97 754.53 2.31%        19.08
Equipment & Operator hire 646.98 621.73 4.06%        15.86
Fit out by specialist trades 718.38 756.22 -5.00%        18.43
General Construction 693.92 827.57 -16.15%        19.02
Insulation 566.18 567.28 -0.19%        14.17
Joinery 545.01 571.12 -4.57%        13.95
Mechanical 736.75 1,040.00 -29.16%        22.21
Plastering 642.53 563.68 13.99%        15.08
Plumbing 693.20 702.07 -1.26%        17.44
Roofing 344.60 402.53 -14.39%         9.34
Scaffolding 525.12 491.80 6.78%        12.71
Shopfitting 1,086.56 1,272.38 -14.60%        29.49
Steel & Timber frame erect 588.53 535.57 9.89%        14.05
Surfacing contractors 597.36 608.24 -1.79%        15.07
AVE….. 635.51 659.46 -3.63%        16.19
       
South East Last Past 3 month /Hour
  Month 3 months change Ave
Bricklaying 485.00 568.29 -14.66%        13.17
Civil Engineering 644.67 753.29 -14.42%        17.47
Demolition 513.20 607.03 -15.46%        14.00
Electrical 854.98 975.23 -12.33%        22.88
Equipment & Operator hire 664.87 759.30 -12.44%        17.80
Fit out by specialist trades 650.40 668.86 -2.76%        16.49
General Construction 678.56 638.48 6.28%        16.46
Insulation 558.27 697.18 -19.92%        15.69
Joinery 705.45 644.76 9.41%        16.88
Mechanical 755.56 906.25 -16.63%        20.77
Plastering 784.98 711.07 10.39%        18.70
Plumbing 1,067.75 932.07 14.56%        25.00
Roofing 650.40 692.05 -6.02%        16.78
Scaffolding 525.50 513.42 2.35%        12.99
Shopfitting 797.86 844.32 -5.50%        20.53
Steel & Timber frame erect 526.67 703.00 -25.08%        15.37
Surfacing contractors 532.10 519.37 2.45%        13.14
AVE….. 670.37 713.76 -6.08%        17.30
       
South West Last Past 3 month /Hour
  Month 3 months change Ave
Bricklaying 428.75 492.77 -12.99%        11.52
Civil Engineering 509.54 621.58 -18.03%        14.14
Demolition 539.03 472.01 14.20%        12.64
Electrical 605.19 653.75 -7.43%        15.74
Equipment & Operator hire 409.19 541.25 -24.40%        11.88
Fit out by specialist trades 682.92 608.68 12.20%        16.15
General Construction 626.72 567.90 10.36%        14.93
Insulation 571.25 608.38 -6.10%        14.75
Joinery 320.61 359.54 -10.83%        12.50
Mechanical 943.73 847.88 11.30%        22.40
Plastering 682.38 596.77 14.35%        15.99
Plumbing 584.19 598.42 -2.38%        14.78
Roofing 513.14 548.93 -6.52%        13.28
Scaffolding 659.00 757.85 -13.04%        17.71
Shopfitting 584.17 578.36 1.00%        14.53
Steel & Timber frame erect 600.00 510.19 17.60%        13.88
Surfacing contractors 577.57 580.13 -0.44%        14.47
AVE….. 578.67 584.96 -1.08%        14.55

The difference between the above rates and daywork rates - explained below

For example if a company has a turnover of 8.3 million and have a direct labour force of 100 with 33 sub contractors on top of that, with a head office staff of 30 it can be seen as such that an approx. breakdown of their costs, that would be used to build-up their daywork rate, would be;-

  Relevant
Daywork Cost
Head Office Costs all-in       2,496,000        2,496,000
Direct Labour at 15.50/Hr       3,224,000        3,224,000
Materials       1,040,000  
Vehicles & Plant           84,065            84,065
Fuel           65,000            65,000
Sub-contractors       1,400,000        1,400,000
   
 8,309,064.67   7,269,064.67
   
Approx. Daywork Rate

/Hr

 26.28

These daywork rates can be checked using the sub contractors audited accounts, which are a matter of public record if they are a limited liability company. See our daywork information;-

Daywork Rates 2008

Daywork Rates 2009

Daywork Rates 2010

Daywork Rates 2011

Daywork Rates 2012

 

Free Construction Daywork Sheet excel template Daywork Sheet with formulae included

 

  Bookmark and Share    

Put simply buy

from option 1 of 2

1

Fully Editable Daywork Sheet Template Daywork (c) TM   

 

 

 

   Editable Daywork   Press this button to buy our fully editable daywork sheet template, this is the same as the free daywork sheet but you can edit everything including the formula delivered by email, which is not a cost, but, pure value...

 

 

  Only 8.00    and it's automatically emailed to you after purchase is confirmed

 

 

 click it

 

- secure payment facility -   buy now by Credit Card  or Paypal Now Secure PaymentA5 Secure PaymentA6 Secure PaymentA5 A6 Secure Payments

     

Put simply buy

from option 2 of 2

2

QA, RFI, COI & Daywork Sheet Templates QRC&Daywork (c) TM   

 

 

 

   Editable Record Set   Press this button to buy our fully editable Qaulity Assurance, RFI, COI and daywork sheet templates, Upgrade to the new version that includes an automated QA, RFI, COI and Daywork Sheet that are all linked together to speed up and improve your site record keeping, it's delivered by email, which is not a cost, but, pure value...

 

 

  Only 20.00    and it's automatically emailed to you after purchase is confirmed

 

 

 click it

 

- secure payment facility -   buy now by Credit Card  or Paypal Now Secure PaymentA5 Secure PaymentA6 Secure PaymentA5 A6 Secure Payments

   products and services to buy - press me

   for up to date prices buy our Live-up-date service

   where over 8,000 unit rates are up dated dail

 

  http://www.constructionrates.co.uk/

 

             

  [ If you have problems downloading with this e-mail, make sure you are on-line and that your security settings are not too high,

  [see menu bar] Select Tools, Option, Security and make sure you're set on the Internet Zone. ]

    

 

 Trade Locator

   

     Helping you  to find trade contractors fast - Another service from  www . construction rates . co . uk

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

 Construction is our world

 Construction is your world

 Get your message across in our world

 

    

      email us now

 

| play the Daywork Game price data at the speed of light |

See our construction rates products to buy Construction Rate Specification and Specialist Trade Supply Chain Data

   
See our other products below
Bookmark and Share  
interactive builder of specifications and rates

buy our Excelling Rate &Specification Generation Software Suite for the very small price of 15.00

http://www.constructionrates.co.uk/construction_rates_generate_specification_and_prices.htm

   
Massive DataBase of Specialist Contractors

buy our Data base of Specialist trade Sub Contractors for the very small price of 15.00

http://www.constructionrates.co.uk/construction_rates_specification_specialists.htm

   
Construction Daywork Sheet Template

   Editable Daywork   Press this button to buy our fully editable daywork sheet template, this is the same as the free daywork sheet but you can edit everything including the formula delivered by email, 5.00

http://www.constructionrates.co.uk/RICS_Prime_Cost_of_Daywork_UK_Construction_Industry_6th_April_2011.htm

   
Construction Daywork Template with QA COI RFI Templates

  Editable Record Set   Press this button to buy our fully editable Qaulity Assurance, RFI, COI and daywork sheet templates, Upgrade to the new version that includes an automated QA, RFI, COI and Daywork Sheet that are all linked together to speed up and improve your site record keeping 15.00

http://www.constructionrates.co.uk/RICS_Prime_Cost_of_Daywork_UK_Construction_Industry_6th_April_2011.htm

Bookmark and Share  
construction excel dim take off measurement sheet

  Excel Auotmated Take Off   Press this button to buy our fully editable Automated Take Off Sheet template, Simply click to insert take off dims.  An automated way to quickly input data in to an electronic take off for estimates, variations, final accounts or the like 15.00

http://www.constructionrates.co.uk/Rate_Gen/Construction_Estimating_Software_Solutions_UK.html

   
construction excel dim take off measurement abstract and billing sheet   Excel Auotmated Take Off & Billing   Press this button to buy our fully editable Automated Take Off and Billing Sheet template, Simply click to insert take off dims and then transfer to billing.  An automated way to quickly input data in to an electronic take off for estimates, variations, final accounts and includes the abstract and billing or the like 25.00

http://www.constructionrates.co.uk/Rate_Gen/Construction_Estimating_Software_Solutions_UK.html

   
Construction Programme Software with Cost and Management

   Programme & Costs   Press this button to buy our editable and Automated Visual Programming software, From Estimate to Targets to Valuations to Final Account visually anticipate, monitor and report real time progress.   An automated way to quickly input data in to an electronic Programme for estimates, valuation, variations, final accounts see the impact of delays and extensions of time or the like, it's delivered by email, which is not a cost, but, pure value...59.99

 http://www.constructionrates.co.uk/Rate_Gen/Construction_programme_software_Cost_Estimating_Solutions_UK.html

Construction Programme Software with Cost and Management

   PDF SCALE - Measure to Excel   

Press this button to buy our PDF Take Off program to export your dims to Excel, Simply click to take-off dims in insert in to Excel.  A quickly way to get measured data in to an electronic Excel take-off for estimates, valuations, variations, final accounts or the like, it's delivered by an email download link, which is not a cost, but, pure value...

A one-off payment for full single user access...Only 99.99

 http://www.constructionrates.co.uk/Rate_Gen/Construction_PDF_Quick_Scale_Take-off_Measurement_Tool.html