LCC Life Cycle Maintenance costs, corrective, preventive, predictive, rates for maintaining and upgrading.

 

Please see below a list of rates for the likely costs of taking your building back to it's post construction best, these are based on an average across the UK and are taken at the 5 to 9 year point of post PC LCC planned/reactive maintenance point.

 

 
Replacement Barrier Matting Floor Finishes, Out of Hours Works, Rates for making good.

 

  • The following are for your consideration during the planning & design stage of LCC.
  • Do-nothing - The Do-Nothing option is literally not investing any money on any form of maintenance or renewal, including that recommended by the design engineer or OEM vendor. This alternative is generally intended to set a conceptual baseline for asking the question: “What value does what we do now or what we plan to do add to extending the life/functionality/reliability of the asset over doing nothing at all?” Another way of looking at the core question posed here is, “Why should we continue to do what we do or are anticipating doing?” There are rather rare occasions when “Do Nothing” is a valid applied approach such as when an asset is due to be replaced or shut down in short order and additional maintenance/capital investment is irrelevant to keeping it running for the short period before it is to be decommissioned.
  • Status Quo - The Status Quo option is defined as maintaining the current operations and maintenance behaviour – typically that defined by the manufacturer or the design engineer. It is the realistic baseline case against which other alternatives are compared.
  • Renewal (Major Repair, Rehabilitation or Replacement) - Assessment of different rehabilitation or replacement strategies requires an understanding of the costs and longevity of different asset intervention strategies. Each strategy is costed for the expected life of that strategy, converted to an equivalent present worth, adjusted for varying alternative life lengths, and compared to find the least overall cost.
  • Non-Asset Solutions - In certain circumstances the non-asset solution (providing the same level of service without a major additional investment) can be a viable alternative (for example, using pricing strategies to reduce the consumption of water).
  • Change Levels of Service - Most life cycle costing assumes a constant Level of Service across options being compared. When such is not the case (which is not infrequent in reality), comparisons across alternatives with different levels of service (that is, different levels of benefit) must intro duce a projected benefits section for each alternative in addition to the cost projections. This, of course, takes the analysis into the realm of benefit cost analysis (see the Benefit Cost Tool for much more discussion and tool support).

 

   products and services to buy - press me

 

  for up to date prices buy our Live-up-date service

   where over 8,000 unit rates are up dated daily

 

Replaceing Carpet, Carpet Tile, Vinyl Floor, Marmoleum Floor, finishes of Buildings in use under a chain of stakeholders.

 

 

How would you like to measure from PDF drawings and get your Measure into Excel Fast

REMEMBER - you're Just a few Clicks from Taking-off Fast !     

 

Heckmondwike Diamond matting tiles  including the uplift and disposal of existing matting, adhesive and labour.  Work to be undertaken out of normal hours.
     
Box Contains 4m²    
     
Popular Battleship/Hippo is a dedicated entrance area carpet which is used extensively in education and public sector buildings as it has been designed to clean shoes and is ideal as an interceptor. Hippo comes with a rubber waffle backing and can be loose laid in small areas or footwells.
     
British made    
Specially designed for entrance areas    
Will not ravel or fray    
Thermal properties conserve heat    
Acoustic properties reduce noise pollution    
Low maintenance costs    
Low installation costs    
Specification       Diamond    
     
Fibre Construction (Tile)  100% Polypropylene    
     
Colour Fastness Light (BS EN ISO 105:B02) >6    
     
Wet Rubbing (BS EN ISO 105:BO1) 5    
     
Dry Rubbing (BS EN ISO 105:X12) 5    
     
Flammability       BS6307 Methanamine Pill Test - Pass    
     
Formats Sheet    Tile    
     
Backing Rubber Crumb    Bitumen    
     
Size 50cm x 50cm    
     
Weight  4976 gsm    
     
Thickness 11mm    
     
     
http://www.scribd.com/doc/115010830/Heckmondwike-Diamond-Entrance-Matting-Tiles
     
Take up existing barrier matting (note like for like - no change in level of base floor) m2           2.08
Make good full screed. m2           7.80
Install new floor finish above  m2         40.30
Moving items in lobby area m2           0.13
Working out of hours m2           7.80
OH&P if managed m2           8.94

 

How would you like a Schedule of rates that you can control by changing Labour, Materials, Plant, Waste. buy now you should be more Productive... ...click for more info...

Remember  - you're Just a few clicks from pricing Faster !          

 

 

 

 
To supply and fit Gradus Access matting as per your specification, including the uplift and disposal of existing matting, adhesive and labour.  Work to be undertaken out of normal hours.
     
http://www.gradusworld.com/access-matting
     
Gradus Access matting is an easy to install, primary barrier mat suitable for medium levels of foot and wheeled traffic, e.g. in schools, offices and some high street shops. Due to its non-metallic nature, Access is ideal for use where electronic tagging systems operate.  Download our illustrative guide that shows where Access can be used.
     
Access comprises a moulded black or grey rubber base with 100% solution-dyed nylon wipers that provide excellent soil and moisture retention (in a choice of 16 colours). Access co-ordindates with Boulevard 6000 and Boulevard 5000HD for a complete entrance solution.
     
Access is available in 12mm thickness for recessing into a matwell or surface mounting when used with a suitable ramping strip.  Access 17mm is for recessing only. Spacer strips are supplied to provide a neat finish to the mat.
     
The mats are provided in 0.5m x 2.0m modules and are supplied oversized for shaping and trimming on site.  Access is tested for dimensional stability, flammability tested to BS 4790 and slip-resistance using the HSL ramp test, achieving a low risk of slip.
     
Gradus Access matting is available on the 5 day manufacturing service.
     
Take up existing barrier matting (note like for like - no change in level of base floor) m2           2.08
Make good full screed. m2           9.10
Install new floor finish above  m2      370.50
Moving items in lobby area m2           0.13
Working out of hours m2           7.80
OH&P if managed m2         59.94

 

 

How would you like to measure from PDF drawings and get your Measure into Excel Fast

REMEMBER - you're Just a few Clicks from Taking-off Fast !     

 

   products

  http://www.constructionrates.co.uk/

      email us now

 

| play the Daywork Game price data at the speed of light |

See our construction rates products to buy Construction Rate Specification and Specialist Trade Supply Chain Data

Buy products below  
  Bookmark and Share  
 
 
 
 
Schedule of Rates - Dynamic (it's just 20p per day) click for more info
buy you dynamic access to 12 month of construction rates schedule of rates for the very small price of £73.00
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2016.10
 
£73.00 New
 subscribe yearly by credit card by pressing now! £73.00
subscribe yearly by credit card by pressing now! £73
Building Construction Schedule of Rates UK - Dynamic

click for more info

                                           - secure payment facility -   buy now by Credit Card  or Paypal Now Secure PaymentA5 Secure PaymentA6 Secure PaymentA5 A6 Secure Payments
   
   
 
Schedule of Rates - Dynamic (it's just 20p per day) click for more info
buy you dynamic access to 12 month of construction rates schedule of rates for the very small price of £75.00
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2016.10
 
£75.00 New

No reoccurring subscription, note the Data is only provided for 12 months
Building Construction Schedule of Rates UK - Dynamic

click for more info

                                           - secure payment facility -   buy now by Credit Card  or Paypal Now Secure PaymentA5 Secure PaymentA6 Secure PaymentA5 A6 Secure Payments
 

Schedule of Rates for Electrical Work UK - Dynamic (it's less than 11p per day)

 click for more info

buy your dynamic access to 12 month of construction rates schedule of rates for the very small price of £45.00
Construction Software
Manufactured by: Construction Rates
Model: Electrical Schedule of Rates UK
Product ID: Dataflow Version 008.2016.10
 

£45.00 New

Building Construction Schedule of Electrical Rates UK
                                           - secure payment facility -   buy now by Credit Card  or Paypal Now Secure PaymentA5 Secure PaymentA6 Secure PaymentA5 A6 Secure Payments
   
buy our data base of specifications and rates for the very small price of £25.99
Construction Software
Manufactured by: Construction Rates
Model: Excel Schedule (note this is the PDF version) click for Excel version
Product ID: Schedule Version 000.2013.06
5 based on 947 reviews
£25.99 New

 ...a simple spreadsheet schedule of rates...
   
 
Live-up-date Press this button to buy our Excel schedule of over 18,000 unit rates which updates on-line every time you press the 'Live-up-date' button for the very small price of £59.99
Construction Software
Manufactured by: Construction Rates
Model: Live rates
Product ID: Live_Update Version 000.2013.01
5 based on 311 reviews
£59.99 New

Rates LiveUpdates on-line
   
 
Live-up-date - Advanced Press this button to buy our Excel schedule of several thousand unit rates, spec's, labour and plant/material breakdown which updates on-line every time you press the 'Live-up-date' button for the very small price of £69.00
Construction Software
Manufactured by: Construction Rates
Model: Live rates Advanced
Product ID: Live_Update Advanced Version 000.2013.04
5 based on 768 reviews
£69.00 New

Advanced LiveUpdates on-line
   
 
buy our Excelling Rate & Specification Generation Suite for the very small price of £10.00 each
Construction Software
Manufactured by: Construction Rates
Model: Rate & Specification Generation
Product ID: Generator Version 000.2013.04
 
From £10.00 to £45.00 New

Click here for details or buy all now below

interactive builder of specifications and rates
   
 
buy our Database of Specialist trade Sub Contractors for the very small price of £21.00
Construction Software
Manufactured by: Construction Rates
Model: Database of Specialists
Product ID: Database Version 000.2012.12
 
£21.00 New

 
Massive DataBase of Specialist Contractors
   
 
Suite of 3 - all of the above products (including DataBase, Schedule & Generators)
buy our All 3 of the above plus support and 12 month subscription for the very small price of £55.00
Construction Software
Manufactured by: Construction Rates
Model: Suite of 3
Product ID: Database Version 000.2012.08
 
£55.00 New
subscribe yearly by credit card by pressing now! £50
   
 
Editable Daywork Press this button to buy our fully editable daywork sheet template, this is the same as the free daywork sheet but you can edit everything including the formula delivered by email, £8.00
Construction Software
Manufactured by: Construction Rates
Model: Daywork template
Product ID: Daywork Template Version 000.2013.02
 
£8.00 New 

Construction Daywork Sheet Template
   
 
Editable Record Set Press this button to buy our fully editable Qaulity Assurance, RFI, COI and daywork sheet templates, Upgrade to the new version that includes an automated QA, RFI, COI and Daywork Sheet that are all linked together to speed up and improve your site record keeping £20.00
Construction Software
Manufactured by: Construction Rates
Model: QA, RFI, COI and Daywork template
Product ID: QA, RFI, COI and Daywork Template Version 000.2013.02
 
£20.00 New

Construction Daywork Template with QA COI RFI Templates
   
 
Excel Automated Take Off Press this button to buy our fully editable Automated Take Off Sheet template, Simply click to insert take off dims. An automated way to quickly input data in to an electronic take off for estimates, variations, final accounts or the like £22.00
Construction Software
Manufactured by: Construction Rates
Model: Excel Automated Take Off template
Product ID: Excel Automated Take Off Template Version 000.2013.02
 
£22.00 New

construction excel dim take off measurement sheet
   
 
Excel Auotmated Take Off & Billing Press this button to buy our fully editable Automated Take Off and Billing Sheet template, Simply click to insert take off dims and then transfer to billing. An automated way to quickly input data in to an electronic take off for estimates, variations, final accounts and includes the abstract and billing or the like £32.00
Construction Software
Manufactured by: Construction Rates
Model: Automated Take-off & Billing Sheet
Product ID: Automated Take-off & Billing Sheet Template Version 000.2013.02
 
£32.00 New

construction excel dim take off measurement abstract and billing sheet
   
 
Excel Auotmated Take Off, Spec Description, Rates & Billing Press this button to buy our fully editable Automated Take Off and Billing Sheet template, Simply click to insert take off dims and then transfer to billing. An automated way to quickly input data in to an electronic take off for estimates, variations, final accounts and includes the abstract and billing or the like £60.00
Construction Software
Manufactured by: Construction Rates
Model: Automated Take-off Spec Rate & Billing Sheet
Product ID: Automated Take-off Spec Rate & Billing Sheet Template Version 000.2013.02
 
£60.00 New

construction excel dim take off measurement abstract and billing sheet
   
 
Programme & Costs Press this button to buy our editable and Automated Visual Programming software, From Estimate to Targets to Valuations to Final Account visually anticipate, monitor and report real time progress. An automated way to quickly input data in to an electronic Programme for estimates, valuation, variations, final accounts see the impact of delays and extensions of time or the like, it's delivered by email, which is not a cost, but, pure value...£59.99
Construction Software
Manufactured by: Construction Rates
Model: Construction Programming Costing and Management Software
Product ID: Construction Programming Costing and Management Software Template Version 000.2012.09
 
£59.99 New
 subscribe yearly by credit card by pressing now! £59.99
Construction Programme Software with Cost and Management
   
 
PDF SCALE - Measure to Excel Press this button to buy our PDF Take Off program to export your dims to Excel, Simply click to take-off dims in insert in to Excel. A quickly way to get measured data in to an electronic Excel take-off for estimates, valuations, variations, final accounts or the like, it's delivered by an email download link, which is not a cost, but, pure value... A one-off payment for full single user access...Only £99.99
Construction Software
Manufactured by: Construction Rates
Model: Construction PDF to Excel Take-off Software
Product ID: Construction PDF to Excel Take-off Software Version 000.2013.05
 
£99.99 New

construction excel dim take off measurement sheet
   
 
24 Month Payment & Authorisation Template  Press this button to buy our editable and Automated Sub Contract Payment and Authorisation Schedule. An automated way to quickly input payment data in to an electronic sheet that will manage payment dates, discounts, retentions CITB, Contras etc or the like, it's delivered by email, which is not a cost, but, pure value...
Construction Software
Manufactured by: Construction Rates
Model: Sub-Contractor Payment & Authorisation Template
Product ID: Sub-Contractor Payment & Authorisation Template Version 000.2013.05
 
£25.00 New

Sub Contract Payment and Authorisation Schedule Template
   
 
24 Month Application & Invoice Template  Press this button to buy our editable and Automated Contractor Application for Payment and Invoice Template. An automated way to quickly input applications for payment data in to an electronic sheet that will manage payment dates, discounts, retentions CITB, Contras etc or the like, it's delivered by email, which is not a cost, but, pure value...   Only £29.99   it's automatically emailed to you after purchase is confirmed
Construction Software
Manufactured by: Construction Rates
Model: Contractor Application & Invoice Template
Product ID: Contractor Application & Invoice Template Version 000.2013.03
 
£29.99 New

Sub Contractor/Contractor Application for Payment or Invoice Template
   
 
Valuation Template - buy our editable and Automated Contractor Valuation Template. An automated way to quickly input Valuation data in to an electronic sheet that will manage Materials on Site & Off Site, Variations, Dayworks, Measured Work, Anticipated Final Account or the like, it's delivered by email, which is not a cost, but, pure value...
Construction Software
Manufactured by: Construction Rates
Model: Contractor Valuation Template Template
Product ID: Contractor Valuation Template Version 000.2012.08
 
£24.99 New

Sub Contractor/Contractor Construction Valuation Template Excel
 

 

These are tools for construction professionals. You must double check the correctness of all rates and quantities before tendering and or entering into a contract with another party. All rates and prices generated are provided as a general indication only and may differ depending upon site conditions, volume etc. We do not warrant their accuracy. Remember, the correct rates are the ones with which a quality specialist is prepared to enter into contract with you.  ALL quantities should be checked and double checked. We do not warrant the suitability of any organisation contained within this site. The producers of this site will accept no liability whatsoever for any loss [howsoever arising] which may result from using this or any information on or obtained from this site. You must accept the above before you may use this site. You are responsible for any losses that may result from not checking all rates with an appropriate source. If you Do Not Accept the above you should not use any information in any way. (c) Copyright Construction Rates 2001 - By continuing you are accepting our copyright and our conditions.