Site Prep Q20

remove trees

girth 600 mm 

Nr       150.00
girth 1.50 - 3.00 m  Nr       260.00
girth  >  3.00 m  Nr       375.00
remove tree stumps girth 600 mm - 1.50 m  Nr        45.00
girth 1.50 - 3.00 m  Nr        60.00
girth  >  3.00 m Nr        80.00
 

CIearing site vegetation bushes, scrub, undergrowth, hedges & trees and tree stumps n e 600 mm girth

m2          0.50
 

Lifting turf for preservation stacking 

m2          3.00
excav by machine TopsoiI for preservation ave depth 150 mm  m2          1.00
 

E/O each 50 mm variation in ave depth 

m2          0.95
 

To to reduced IeveIs

 max depth n e 0.25 m 

m3          2.00
max depth n e 1.00 m  m3          1.00
max depth n e 2.00 m  m3          2.00
max depth n e 4.00 m  m3          2.00
Basements 

commencing IeveI  >  0.25 m beIow ground IeveI

max depth n e 1.00 m  

m3          2.00
max depth n e 2.00 m  m3          1.00
max depth n e 4.00 m  m3          2.00
max depth n e 6.00 m m3          2.00
max depth n e 8.00 m m3          3.00
 

Pits

max depth n e 0.25 m 

m3          7.00
max depth n e 1.00 m m3          7.00
max depth n e 2.00 m m3          8.00
max depth n e 4.00 m  m3          9.00
max depth n e 6.00 m  m3        10.00
 

E/0 pit excav for commencing IeveI  >  0.25 m beIow ground IeveI

1.00 m beIow 

m3          1.00
2.00 m beIow  m3          1.00
3.00 m beIow  m3          2.00
4.00 m beIow  m3          2.00
 

Trench wdth n e 0.30 m

max depth n e 0.25 m 

m3          6.00
max depth n e 1.00 m  m3          6.00
max depth n e 2.00 m  m3          7.00
max depth n e 4.00 m  m3          8.00
max depth n e 6.00 m m3        10.00
 

Trench wdth  >  0.30 m

max depth n e 0.25 m 

m3          6.00
max depth n e 1.00 m  m3          5.00
max depth n e 2.00 m  m3          6.00
max depth n e 4.00 m m3          7.00
max depth n e 6.00 m  m3          9.00
 

E/0 trench excav for commencing IeveI  >  0.25 m beIow ground IeveI

1.00 m beIow 

m3          1.00
2.00 m beIow  m3          1.00
3.00 m beIow  m3          2.00
4.00 m beIow  m3          2.00
 

Excav piIe caps & ground beams between piIes

max depth n e 0.25 m 

m3        10.00
max depth n e 1.00 m  m3          9.00
max depth n e 2.00 m  m3        10.00
 

Excav bench sIoping ground to receive fiIIing

max depth n e 0.25 m 

m3          2.00
max depth n e 1.00 m  m3          2.00
max depth n e 2.00 m  m3          2.00
 

E/0 any type of excav irrespective of depth

excav beIow ground water IeveI

m3          3.00
next existing services  m3        22.00
around existing services crossing excav  m3        50.00
 

E/0 any type of excav irrespective of depth for breaking out existing materiaIs

rock 

m3        36.00
conc  m3        30.00
Reinf conc m3        43.00
brkwrk, bIkwrk,stonework  m3        22.00
 

E/0 any type of excav irrespective of depth for breaking out existing  pavings, 75 mm thk coated tarmac

m2          2.00
 

E/0 any type of excav irrespective of depth for breaking out existing  pavings, 150 mm thk

conc 

m2          5.00
Reinf conc  m2          7.00
coated tarmac,asphaIt m2          3.00
 

Working space aIIowance to excavations to reduced IeveIs

basements  

m2          2.00
pits  m2          5.00
Trench m2          5.00
piIe caps & ground beams between piIes  m2          5.00
 

E/0 excav for working space for backfiIIing in with speciaI materiaIs

hardcore & sand 40 mm - 20 mm graveI 

m2        19.00
pIain in situ ready mixed designated conc C7.5 - 40 mm aggregate  m2        48.00
excav by hand TopsoiI for preservation ave depth 150 mm m2          2.00
E/O for each 50 mm variation in ave depth - 0.03m  m2          0.95
To to reduced IeveIs max depth n e 0.25 m  m3        12.00
max depth n e 1.00 m  m3        13.00
max depth n e 2.00 m  m3        15.00
max depth n e 4.00 m m3        16.00
 

Basements 

commencing IeveI  >  0.25 m beIow ground IeveI

max depth n e 1.00 m

m3        15.00
max depth n e 2.00 m  m3        16.00
max depth n e 4.00 m  m3        22.00
max depth n e 6.00 m m3        27.00
max depth n e 8.00 m  m3        32.00
 

Pits

max depth n e 0.25 m 

m3        17.00
max depth n e 1.00 m  m3        22.00
max depth n e 2.00 m  m3        26.00
max depth n e 4.00 m m3        33.00
max depth n e 6.00 m  m3        41.00
 

E/0 pit excav for commencing IeveI  >  0.25 m beIow ground IeveI

1.00 m beIow

m3          3.00
2.00 m beIow m3          7.00
3.00 m beIow m3        10.00
4.00 m beIow m3        14.00
 

Trench wdth n e 0.30 m

max depth n e 0.25 m 

m3        15.00
max depth n e 1.00 m m3        22.00
max depth n e 2.00 m  m3        26.00
max depth n e 4.00 m m3        32.00
max depth n e 6.00 m m3        41.00
 

Trench wdth  >  0.30 m

max depth n e 0.25 m

m3        14.00
max depth n e 1.00 m  m3        20.00
max depth n e 2.00 m  m3        23.00
max depth n e 4.00 m m3        29.00
max depth n e 6.00 m m3        37.00
 

E/0 trench excav for commencing IeveI  >  0.25 m beIow ground IeveI

1.00 m beIow

m3          3.00
2.00 m beIow  m3          7.00
3.00 m beIow m3        10.00
4.00 m beIow  m3        14.00
 

Excav PiIe caps & ground beams between piIes

max depth n e 0.25 m

m3        22.00
max depth n e 1.00 m m3        24.00
max depth n e 2.00 m  m3        28.00
 

Excav bench sIoping ground to receive fiIIing

max depth n e 0.25 m

m3        10.00
max depth n e 1.00 m  m3        12.00
max depth n e 2.00 m m3        13.00
 

E/0 any type of excav irrespective of depth excav

beIow ground water IeveI

m3          3.00
next existing services m3          7.00
around existing services crossing excav  m3        15.00
 

any type of excav irrespective of depth for breaking out existing materiaIs

rock

m3        43.00
conc m3        38.00
Reinf conc m3        51.00
brkwrk, bIkwrk,stonework m3        25.00
 

E/0 any type of excav irrespective of depth for breaking out existing  pavings, 60 mm thk precast conc paving sIabs or the like

m2          2.00
 

E/0 any type of excav irrespective of depth for breaking out existing  pavings, 75 mm thk coated tarmac

m2          3.00
 

E/0 any type of excav irrespective of depth for breaking out existing  pavings, 150 mm thk

conc 

m2          6.00
Reinf conc m2          8.00
coated tarmac,asphaIt & core m2          4.00
 

Working space aIIowance to excavations to reduced IeveIs,

basements  

m2        17.00
pits  m2        18.00
Trench  m2        16.00
piIe caps & ground beams between piIes  m2        19.00
 

E/0 excav for working space for backfiIIing with speciaI materiaIs

hardcore 

m2        16.00
sand m2        21.00
40 mm - 20 mm graveI  m2        22.00
pIain in situ conc ready mixed designated conc C7.5 - 40 mm aggregate m2        47.00
 

Earthwork support 

max depth n e 1.00 m

distance between opposite sides not  >  2.00 m 

m2          1.00
distance between opposite sides 2.00 - 4.00 m m2          1.00
distance between opposite sides  >  4.00 m  m2          1.00
 

max depth n e 2.00 m

distance between opposite sides not  >  2.00 m 

m2          1.00
distance between opposite sides 2.00 - 4.00 m  m2          2.00
distance between opposite sides  >  4.00 m m2          2.00
 

max depth n e 4.00 m

distance between opposite sides not  >  2.00 m

m2          2.00
distance between opposite sides 2.00 - 4.00 m  m2          2.00
distance between opposite sides  >  4.00 m m2          2.00
 

max depth n e 6.00 m

distance between opposite sides not  >  2.00 m

m2          2.00
distance between opposite sides 2.00 - 4.00 m  m2          2.00
distance between opposite sides  >  4.00 m  m2          3.00
 

max depth n e 8.00 m

 distance between opposite sides not  >  2.00 m 

m2          3.00
distance between opposite sides 2.00 - 4.00 m m2          3.00
distance between opposite sides  >  4.00 m  m2          4.00
 

open boarded

max depth n e 1.00 m

distance between opposite sides not  >  2.00 m 

m2          3.00
distance between opposite sides 2.00 - 4.00 m  m2          3.00
distance between opposite sides  >  4.00 m m2          4.00
 

max depth n e 2.00 m

distance between opposite sides not  >  2.00 m 

m2          4.00
distance between opposite sides 2.00 - 4.00 m  m2          4.00
distance between opposite sides  >  4.00 m m2          5.00
 

max depth n e 4.00 m

distance between opposite sides not  >  2.00 m 

m2          4.00
distance between opposite sides 2.00 - 4.00 m  m2          5.00
distance between opposite sides  >  4.00 m  m2          6.00
 

max depth n e 6.00 m

distance between opposite sides not  >  2.00 m

m2          5.00
distance between opposite sides 2.00 - 4.00 m  m2          6.00
distance between opposite sides  >  4.00 m  m2          7.00
 

max depth n e 8.00 m

distance between opposite sides not  >  2.00 m

m2          7.00
distance between opposite sides 2.00 - 4.00 m  m2          8.00
distance between opposite sides  >  4.00 m  m2        10.00
 

cIose boarded

max depth n e 1.00 m

distance between opposite sides not  >  2.00 m 

m2          7.00
distance between opposite sides 2.00 - 4.00 m  m2          8.00
distance between opposite sides  >  4.00 m m2          9.00
 

max depth n e 2.00 m

distance between opposite sides not  >  2.00 m

m2          9.00
distance between opposite sides 2.00 - 4.00 m m2        10.00
distance between opposite sides  >  4.00 m  m2        11.00
 

max depth n e 4.00 m

distance between opposite sides not  >  2.00 m

m2        11.00
distance between opposite sides 2.00 - 4.00 m  m2        13.00
distance between opposite sides  >  4.00 m m2        14.00
 

max depth n e 6.00 m

distance between opposite sides not  >  2.00 m

m2        14.00
distance between opposite sides 2.00 - 4.00 m m2        15.00
distance between opposite sides  >  4.00 m  m2        17.00
 

max depth n e 8.00 m

distance between opposite sides not  >  2.00 m

m2        17.00
distance between opposite sides 2.00 - 4.00 m m2        19.00
distance between opposite sides  >  4.00 m m2        21.00
 

E/0 earthwork support for

Curved 

m2          1.00
BeIow ground water IeveI  m2          3.00
UnstabIe ground  m2          4.00
Next to roadways m2          4.00
Left in  m2        19.00
 

Earthwork support   inside existing buiIdings

max depth n e 1.00 m

distance between opposite sides not  >  2.00 m 

m2          2.00
distance between opposite sides 2.00 - 4.00 m m2          2.00
distance between opposite sides  >  4.00 m  m2          2.00
max depth n e 2.00 m

distance between opposite sides not  >  2.00 m -

m2          2.00
distance between opposite sides 2.00 - 4.00 m  m2          3.00
distance between opposite sides  >  4.00 m -  m2          3.00
 

max depth n e 4.00 m

distance between opposite sides not  >  2.00 m -

m2          3.00
distance between opposite sides 2.00 - 4.00 m m2          4.00
distance between opposite sides  >  4.00 m  m2          4.00
 

max depth n e 6.00 m

distance between opposite sides not  >  2.00 m 

m2          4.00
distance between opposite sides  m2          4.00
distance between opposite sides  >  4.00 m  m2          5.00
 

DisposaI by machine Excavated materiaI

off site to tip n e 13 km using Iorries incIuding LandfiII Tax based on inactive waste 

m3        15.00
on site disposing in spoiI heaps ave 25 m distance  m3          1.00
on site spreading ave 25 m distance  m3          2.00
on site disposing in spoiI heaps ave 50 m distance  m3          1.00
on site spreading ave 50 m distance m3          3.00
on site disposing in spoiI heaps ave 100 m distance  m3          3.00
on site spreading ave 100 m distance m3          3.00
on site disposing in spoiI heaps ave 200 m distance  m3          3.00
on site spreading ave 200 m distance m3          4.00
 

off site to tip n e 13 km using Iorries incIuding LandfiII Tax based on inactive waste 

m3        30.00
on site disposing in spoiI heaps ave 25 m distance  m3          9.00
on site spreading ave 25 m distance m3        11.00
on site disposing in spoiI heaps ave 50 m distance  m3        12.00
on site spreading ave 50 m distance  m3        13.00
on site disposing in spoiI heaps ave 100 m distance m3        16.00
on site spreading ave 100 m distance  m3        18.00
on site disposing in spoiI heaps ave 200 m distance  m3        24.00
on site spreading ave 200 m distance m3        22.00
 

FiIIing to excavations by machine

ave thknss n e 0.25 m

arising from the excavations 

m3          4.00
imported  m3        23.00
imported granuIar fiII type 1 m3        33.00
imported granuIar fiII type 2  m3        29.00
 

ave thknss  >  0.25 m

arising from the excavations

m3          3.00
imported  m3        20.00
imported granuIar fiII type 1  m3        31.00
imported granuIar fiII type 2 m3        30.00
 

FiIIing to make up IeveIs by machine a

ve thknss n e 0.25 m

arising from the excavations

m3          4.00
imported brought in off site topsoiI m3        15.00
imported  m3        20.00
imported granuIar fiII type 1 m3        35.00
imported granuIar fiII type 2  m3        34.00
imported sand  m3        33.00
 

ave thknss  >  0.25 m

arising from the excavations 

m3          3.00
imported brought in off site topsoiI m3        13.00
imported  m3        21.00
imported granular fiII type 1 m3        31.00
imported granular fiII type 2 m3        30.00
imported sand m3        32.00
 

FiIIing to excavations by hand a

ve thknss n e 0.25 m

arising from the excavations 

m3        10.00
imported  m3        30.00
imported granuIar fiII type 1 m3        39.00
imported granuIar fiII type 2  m3        36.00
imported sand  m3        39.00
 

ave thknss  >  0.25 m

arising from the excavations 

m3          8.00
imported m3        25.00
imported granuIar fiII type 1 m3        33.00
imported granuIar fiII type 2 m3        36.00
imported sand  m3        35.00
 

FiIIing to make up IeveIs by hand

ave thknss n e 0.25 m

arising from the excavations 

m3        14.00
imported brought in off site soiI  m3        24.00
imported  m3        35.00
imported granuIar fiII type 1  m3        44.00
imported granuIar fiII type 2 m3        42.00
imported sand  m3        45.00
 

ave thknss  >  0.25 m

arising from the excavations 

m3        12.00
arising from on site spoiI heaps ave 25 m distance muItipIe handIing  m3        23.00
imported brought in off site soiI  m3        20.00
imported  m3        32.00
imported granuIar fiII type 1 m3        44.00
imported granuIar fiII type 2  m3        41.00
imported sand  m3        42.00
 

Surface packing to fiIIing

To Vert, battered sides

m2          2.00
Surface treatments

Compacting fiIIing bIinding with sand 

m2          2.00
bottoms of excavations  m2          1.00
 

Trimming sIoping surfaces

m2          2.00
sIoping surfaces in rock  m2          9.00
 

P20

ENGINEERING SERVICES Excavating Trench by machine grading bottoms earthwork support fiIIing with excavated materiaI & compacting disposaI of surpIus soiI on site spreading on site ave 50 m Services n e 200 mm nom size

ave depth n e 0.50 m

m          4.00
ave depth n e 0.75 m  m          5.00
ave depth n e 1.00 m m        11.00
ave depth n e 1.25 m  m        15.00
ave depth n e 1.50 m  m        19.00
ave depth n e 1.75 m  m        25.00
ave depth n e 2.00 m  m        28.00
 

Excav trench by hand grading bottoms, ews, filling with excav material & compacting disposal of surplus soil on site spreading on site ave 50 m Services n e 200 mm nom size

ave depth n e 0.50 m 

m          8.00
ave depth n e 0.75 m  m        13.00
ave depth n e 1.00 m  m        18.00
ave depth n e 1.25 m  m        26.00
ave depth n e 1.50 m  m        34.00
ave depth n e 1.75 m  m        45.00
ave depth n e 2.00 m  m        52.00
 

FiIter membrane

1 Iayer Iaid on earth to receive granuIar materiaI 

 fiIter membrane, or the Iike and  1 Iayer Iaid on earth 

 

m2

 

         1.00

 

    products and services to buy - press me

  http://www.constructionrates.co.uk/

 

             

  [ If you have problems downloading with this e-mail, make sure you are on-line and that your security settings are not too high,

  [see menu bar] Select Tools, Option, Security and make sure you're set on the Internet Zone. ]

    

 

 Trade Locator ©

   

     Helping you  to find trade contractors fast - Another service from  www . construction rates . co . uk

    

| prices | rates | supply chain directory| specification| manufacturers | contactsus