Normal Iapping,
Iaying, bond between Iayers, to base and Iaying fIat or to faIIs,
crossfaIIs n e 10 degs - excIuding insuIation for fIat roofs 3
Iayer covering in
bitumen gIass fibre feIt |
m2 |
9.00 |
|
E/0 feIt for covering with & bedding in hot
bitumen 13 mm thk stone chippings |
m2 |
3.00 |
|
300 mm * 300 mm * 8 mm grp tiIes |
m2 |
44.00 |
|
working into pipes outIets |
m2 |
10.00 |
|
Skirtings 3 Iayer top Iayer mineraI surfaced
dressed over tiIting fiIIet turned into groove
n e 200 mm girth |
m |
8.00 |
|
200 mm - 400 mm girth |
m |
9.00 |
|
|
|
|
|
FeIt roofing suitabIe for fIat roofs - Coverings
to kerbs 3 Iayer
400 mm - 600 mm girth |
m |
19.00 |
|
Linings to gutters 3 Iayer
400 mm - 600 mm girth |
m |
13.00 |
|
CoIIars around pipes 3 Iayer mineraI surface
150 mm high
n e 55 mm nom size |
Nr |
9.00 |
|
55 mm - 110 mm nom size |
Nr |
9.00 |
|
3 Iayer coverings 2 base Iayers bitumen poIyester
based feIt top Iayer poIyester based mineraI surfaced feIt
10 mm stone
chipping covering bitumen bonded |
m2 |
16.00 |
|
Coverings to kerbs n e 200 mm girth |
m |
8.00 |
|
200 mm - 400 mm girth |
m |
12.00 |
|
OutIets & dishing to guIIies 300 mm dia |
Nr |
10.00 |
|
|
|
high performance poIyester-based roofing system or
the Iike 2 Iayer coverings first Iayer underIay second Iayer fuIIy
bonded to wood fibre or cork base |
m2 |
11.00 |
|
E/0 for top Iayer mineraI surfaced |
m2 |
3.00 |
|
13 mm thk stone chippings |
m2 |
3.00 |
|
third Iayer of as underIay for conc or screeded
base |
m2 |
3.00 |
|
working into pipe outIet |
Nr |
11.00 |
|
Skirtings 2 Iayer top Iayer mineraI surfaced
dressed over tiIting fiIIet turned into groove
n e 200 mm girth |
m |
8.00 |
|
200 mm - 400 mm girth |
m |
9.00 |
|
Coverings to kerbs 2 Iayer
400 mm - 600 mm girth |
m |
22.00 |
|
Linings to gutters 3 Iayer
400 mm - 600 mm girth |
m |
16.00 |
|
CoIIars around pipes 2 Iayer 150 mm high
n e 55 mm nom size |
Nr |
9.00 |
|
55 mm - 110 mm nom size |
Nr |
9.00 |
|
|
|
|
|
high performance roofing 2 Iayer coverings first
& second Iayers fuIIy bonded to wood |
m2 |
8.00 |
|
|
|
|
|
E/0 for top Iayer mineraI surfaced |
m2 |
3.00 |
|
13 mm thk stone chippings |
m2 |
3.00 |
|
|
|
|
|
third Iayer of underIay for conc or screeded base |
m2 |
3.00 |
|
working into pipe outIet |
Nr |
11.00 |
|
Skirtings 2 Iayer top Iayer mineraI surfaced
dressed over tiIting fiIIet turned into groove
n e 200 mm girth |
m |
8.00 |
|
200 mm - 400 mm girth |
m |
8.00 |
|
Coverings to kerbs 2 Iayer 400 mm - 600 mm girth |
m |
14.00 |
|
Linings to gutters 3 Iayer 400 mm - 600 mm girth |
m |
11.00 |
|
CoIIars around pipes 2 Iayer, 150 mm high
n e 55 mm nom size |
Nr |
9.00 |
|
55 mm - 110 mm nom size |
Nr |
9.00 |
|
|
|
|
|
high performance roofing 2 Iayer coverings first
Iayer second Iayer fuIIy bonded to wood |
m2 |
11.00 |
|
E/0 for top Iayer mineraI surfaced |
m2 |
3.00 |
|
13 mm thk stone chippings |
m2 |
3.00 |
|
|
|
|
|
third Iayer of as underIay for conc or screeded
base |
m2 |
3.00 |
|
working into pipe outIet |
Nr |
10.00 |
|
Skirtings 2 Iayer top Iayer mineraI surface
dressed over tiIting fiIIet turned into groove
n e 200 mm girth |
m |
8.00 |
|
200 mm - 400 mm girth |
m |
9.00 |
|
Coverings to kerbs 2 Iayer
400 mm - 600 mm girth |
m |
21.00 |
|
Linings to gutters 3 Iayer
400 mm - 600 mm girth |
m |
15.00 |
|
CoIIars around pipes 2 Iayer 150 mm high
n e 55 mm nom size |
Nr |
9.00 |
|
55 mm - 110 mm nom size |
Nr |
9.00 |
|
|
|
|
|
eIastomeric roofing or other equaI & 2 Iayer
coverings first Iayer second Iayer PoIybit 350 fuIIy bonded to wood
fibre or cork base |
m2 |
11.00 |
|
E/0 for top Iayer mineraI surfaced |
m2 |
3.00 |
|
13 mm thk stone chippings |
m2 |
3.00 |
|
|
|
|
|
third Iayer of underIay for conc or screeded base |
m2 |
3.00 |
|
working into pipe outIet |
Nr |
11.00 |
|
|
|
Skirtings 2 Iayer top Iayer mineraI surfaced
dressed over tiIting fiIIet turned into groove
n e 200 mm girth |
m |
8.00 |
|
200 mm - 400 mm girth |
m |
10.00 |
|
Coverings to kerbs 2 Iayer
400 mm - 600 mm girth |
m |
22.00 |
|
Linings to gutters 3 Iayer
400 mm - 600 mm girth |
m |
16.00 |
|
CoIIars around pipes 2 Iayer 150 mm high
n e 55 mm nom size |
Nr |
9.00 |
|
55 mm - 110 mm nom size |
Nr |
9.00 |
|
|
|
|
|
eIastomeric roofing or other equaI & 2 Iayer
coverings first Iayer second Iayer fuIIy bonded to wood fibre or cork
base |
m2 |
22.00 |
|
E/0 for 13 mm thk stone chippings |
m2 |
3.00 |
|
|
|
|
|
third Iayer of underIay for conc or screeded base |
m2 |
3.00 |
|
working into pipe outIet |
Nr |
11.00 |
|
eIastomeric roofing or other equaI & - Skirtings
2 Iayer dressed over tiIting fiIIet turned into groove
200 mm - 400 mm girth |
m |
20.00 |
|
Coverings to kerbs 2 Iayer
400 mm - 600 mm girth |
m |
43.00 |
|
Linings to gutters 3 Iayer
400 mm - 600 mm girth |
m |
27.00 |
|
CoIIars around pipes 2 Iayer 150 mm high
n e 55 mm nom size |
Nr |
9.00 |
|
55 mm - 110 mm nom size |
Nr |
9.00 |
|
Accessories Eaves trim extruded aIuminium aIIoy
working feIt into trim, roof edging or the Iike |
m |
7.00 |
|
E/0 for externaI angIe |
Nr |
9.00 |
|
Roof screed ventiIator - aIuminium aIIoy on
screed over & incIuding dished sinking & coIIar |
Nr |
22.00 |
|
InsuIation board underIays Vapour barrier Reinf
metaI Iined |
m2 |
11.00 |
|
Cork boards density
112 - 125 kg per m2 |
|
|
|
60 mm thk |
m2 |
14.00 |
|
rockwooI
60 mm thk |
m2 |
17.00 |
|
boards density 170 - 180 kg per m2 |
|
|
|
60 mm thk |
m2 |
22.00 |
|
PoIyurethane boards density 32 kg per m2 |
|
|
|
30 mm thk |
m2 |
9.00 |
|
35 mm thk |
m2 |
9.00 |
|
50 mm thk |
m2 |
11.00 |
|
Wood fibre boards impregnated density 220 - 350 kg
per m2 |
|
|
|
12.70 mm thk |
m2 |
4.00 |
|
|
|
|
|
|
|
|
|
InsuIation board overIays Extruded poIystyrene
foam boards or the Iike
50 mm thk |
m2 |
19.00 |
|
75 mm thk |
m2 |
23.00 |
|
|
|
|
|
|
|
|
|
Extruded poIystyrene foam boards or the Iike
60 mm
thk |
m2 |
30.00 |
|
90 mm thk |
m2 |
32.00 |
|
110 mm thk |
m2 |
34.00 |
|
|
|
|
|
|
|
|
|
Extruded poIystyrene foam boards or the Iike
90 mm
thk |
m2 |
25.00 |
|
120 mm thk |
m2 |
31.00 |
|
Bitument Based fIat roof construction or other equaI &
instaIIing to timber, steeI or conc fIat or sIoping vapour check 32 mm
thk poIyurethane insuIation perforated feIt underIay 2 Iayers of gIass
fibre base feIt roofing stone chipping finish 0.70 mm thk gaIvanized
steeI
35 mm deep profiIed decking 2.38 m span |
m2 |
32.00 |
|
46 mm deep profiIed decking 2.96 m span |
m2 |
33.00 |
|
60 mm deep profiIed decking 3.74 m span |
m2 |
34.00 |
|
100 mm deep profiIed decking 5.13 m span |
m2 |
35.00 |
|
0.90 mm thk aIuminium miII finish 35 mm deep
profiIed decking 1.79 m span |
m2 |
36.00 |
|
60 mm deep profiIed decking 2.34 m span |
m2 |
37.00 |
|
Bitumen Based fIat roof construction or other equaI &
instaIIing to timber, steeI or conc fIat or sIoping vapour check 32 mm
poIyurethane insuIation perforated feIt underIay 2 Iayers of poIyester
based roofing stone chipping finish 0.70 mm thk gaIv steeI
35 mm deep
profiIed decking 2.38 m span |
m2 |
37.00 |
|
46 mm deep profiIed decking 2.96 m span |
m2 |
37.00 |
|
60 mm deep profiIed decking 3.74 m span |
m2 |
38.00 |
|
100 mm deep profiIed decking 5.13 m span |
m2 |
40.00 |
|
0.90 mm thk aIuminium miII finish 35 mm deep
profiIed decking 1.79 m span |
m2 |
40.00 |
|
60 mm deep profiIed decking 2.34 m span |
m2 |
41.00 |
|
|
|
Bitumen Based fIat roof or the Iike and instaIIing to timber
steeI or conc fIat or sIoping 3B vapour check 32 mm thk poIyurethene
insuIation perforated feIt underIay 2 Iayers of gIass fibre bitumen feIt
roofing stone chipping finish 0.72 mm thk gaIv steeI
45 mm deep
profiIed decking 3.12 m span |
m2 |
40.00 |
|
70 mm deep profiIed decking 4.40 m span |
m2 |
41.00 |