Construction Rates ©

 

    

  

     Helping you  to build specifications, prices and get cost certainty back from the supply chain fast

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

 W20 CCTV Supply and Install  

  Get a quoted rate from a contractor listed on CCTV@tradelocator.co.uk

 

   products and services to buy - press me

 

  for up to date prices buy our Live-up-date service

   where over 18,000 unit rates are up dated daily

 

W20 CCTV

  Bookmark and Share

.  
Venom Pro HD 1080P 2 fixed eyeball camera kit Nr             935.00
E/O for iiyama Pro Lite C1911S-B3 19" BNC VGA LED CCTV Monitor Nr             290.00
E/O for Twilight Pro HDFLD 1080P 3.6mm fixed IR Eye ball dome camera Nr               95.00
   
   
Venom Pro HD 1080P 2 Vari focal eyeball camera kit Nr         1,020.00
E/O for iiyama Pro Lite C1911S-B3 19" BNC VGA LED CCTV Monitor Nr             290.00
E/O for Twilight Pro HDTVFD 1080P 2.8-12mm IR eye ball dome camera Nr             130.00

Do you want more insight on rates more control more relevance more productivity then have a look at at what the Dynamic Schedule of Rates for Measurement (NSRM) offers you

For upto date rates buy our Dynamic service with over 18,000 unit rates in 244 work sections with Dataflow

 

Schedule of Rates - Dynamic (it's just 20p per day)
buy your dynamic access to 12 month of construction rates schedule of rates for the very small price of £73.00
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2016.10
 
£73.00 New
 

Building Construction Schedule of Rates UK - Dynamic

 

These are tools for construction professionals. You must double check the correctness of all rates and quantities before tendering and or entering into a contract with another party. All rates and prices generated are provided as a general indication only and may differ depending upon site conditions, volume etc. We do not warrant their accuracy. Remember, the correct rates are the ones with which a quality specialist is prepared to enter into contract with you.  ALL quantities should be checked and double checked. We do not warrant the suitability of any organisation contained within this site. The producers of this site will accept no liability whatsoever for any loss [howsoever arising] which may result from using this or any information on or obtained from this site. You must accept the above before you may use this site. You are responsible for any losses that may result from not checking all rates with an appropriate source. If you Do Not Accept the above you should not use any information in any way. (c) Copyright Construction Rates 2001 - By continuing you are accepting our copyright and our conditions.

 

 

 

  http://www.constructionrates.co.uk/

 

             

  [ If you have problems downloading with this e-mail, make sure you are on-line and that your security settings are not too high,

  [see menu bar] Select Tools, Option, Security and make sure you're set on the Internet Zone. ]

    

 

 Trade Locator ©

   

     Helping you  to find trade contractors fast - Another service from  www . construction rates . co . uk

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

 Construction is our world

 Construction is your world

 Get your message across in our world

 

    

      email us now

 

| play the Daywork Game price data at the speed of light |